The implement is manually fixed
to one tip of the bed to be dealt
with. It’s connected to a pressure
hose coming from the boiler and the
sling of the winch.
The boiler as well as the winch are
placed in the opposite extreme to
the implement, outside the cubicle.
The winch
pulls the implement at a speed
of 0,6 meter/ min.
A mobil boiler provides pressurized vapor to
the implement.
The winch was counterbalanced and is ready for
use.